Preparations for the autumn-winter period are in full swing in the Chuhuyiv community

This conclusion can be drawn from today's meeting of the city headquarters on preparing housing and communal services and social institutions for winter work. It was held by the head of the Chuguiv city military administration, Galina Minaeva.

During the meeting, the main attention was paid to problematic issues and ways to solve them. Reports were made by heads of municipal enterprises and institutions, who informed about the status of implementation of preparatory measures, existing needs and readiness to work under conditions of increased loads caused by constant Russian strikes.

Addressing those present, Galina Minaeva placed special emphasis on the need to ensure additional sources of energy supply, form an emergency stock of fuel and materials at each enterprise, create safe working conditions for utility workers, and be prepared to work uninterruptedly even in conditions of possible blackouts.

The head of the MVA also emphasized that the focus should always be on the person – whether it is a community resident who receives utility services or an employee of the enterprise who provides them.

So, the community is continuing systematic work to get through the fall-winter period stably and provide residents with the necessary services in any difficult conditions. This is now the number one priority.

Share